| Author |
Description |
Date |
| Publications |
|
|
NTAC Scope Document |
Oct 2003 |
|
NTAC Planning Process Chart |
Oct 28, 2003 |
|
NTAC Planning Process Chart Descriptions |
Oct 28, 2003 |
|
NTAC Work Products Document |
Dec 1, 2003 |
|
NTAC Work Schedule |
Nov 24, 2003 |
| Interesting Documents |
|
| NWPCC, BPA, et al |
NW Wind Integration Action Plan | This document is posted for discussion purposes only and does not necessarily reflect the positions held by NTAC, NWPP, or NWPP member organizations. Word document, 3,646 KB. |
Jan 26, 2007 |
|
NTAC Brochure | NTAC Brochure prepared by PAC |
|
|
Summary Notes from Load Forecasting Workshop |
June 16, 2004 |
| Canada-NW-California Transmission Study Group |
|
| Gordon Dobson-Mack and committee |
CNC Final Report | Includes maps (2.9 MB). Slightly revised. |
May 16, 2006 |
| Stew Jenkinson/Gordon Dobson-Mack |
CNC Option Analysis Tool - revised June 18(?), 2006 | Excel file (2.9 MB) |
Jun 18, 2006 |
| Mahta Boozari |
CNC Options Maps | 5.2 MB pdf |
Dec 8, 2005 |
|
CNC Meeting Materials | 135 KB zip file |
Nov 14, 2005 |
| Bill Hosie |
Can-NW-Cal Economics May 2005 | Excel format (47 KB) |
June 6-7, 2005 |
| Marv Landauer |
CNC Transmission AC Options Map | Word format (45 KB) |
Feb 24, 2005 |
| Marv Landauer |
CNC Transmission DC Options Map | Word format (49 KB) |
Feb 24, 2005 |
| Marv Landauer |
CNC Transmission Options Descriptions | Word format (50 KB) |
Feb 24, 2005 |
|
2007 Heavy Summer Base Case Changes |
Apr 18, 2005 |
|
Objectives and Methodology |
Apr 18, 2005 |
|
Transmission Options List |
Apr 18, 2005 |
|
Voltage Profiles (XLS) | Excel format |
Apr 18, 2005 |
| Montana Transmission Study Group |
|
| Waples, et al |
Montana-NW Equal Angle Study Final Report | (4 MB zip file contains 7 MB Word doc) |
Oct 2005 |
|
A Brief Overview of Selected Transmission Siting Contraints in Western Montana |
|
| Puget Sound Area Study Group |
|
| Phillips, Dobson-Mack, et al |
Final 2007 Update - Puget Sound Area Study | pdf (1235 KB) |
Nov 16, 2007 |
| Phillips, Dobson-Mack, et al |
Final 2004 Draft - Puget Sound Area Study | 752 KB |
Nov 30, 2004 |
| Wind Integration Study Group |
|
|
Wind Files from Chris Reese | zipfile (5 MB) contains:
Revised Northwest 2004 Control Area Loads and Wind.xls,
ntac-profiles-submittal-to-cdeac.xls,
Revised 2004 10 Minute Data.xls |
Jun 27, 2006 |
| Chris Reese |
Control Area Loads and Wind 2004 | Excel file (5.8 MB). This copy includes recent analysis as shown at the May 8, 06 meeting. |
May 8, 2006 |
|
Other Wind Spreadsheets | Duration curves, Generation scaled by BPA wind sites, Regional Wind Projects |
May 8, 2006 |
| Keith Knitter and Rod Noteboom, Grant County PUD |
K Conway Presentation, GCPUD (Wind) | PDF (1,109 KB) |
May 24, 2005 |
| Chris Reese |
Presentation on Wind Integration |
Mar 7, 2005 |
|
Regional Wind Projects (XLS) | Excel format. |
Mar 7, 2005 |