TCWG - Publications
NWPP | NTAC | TCWG | TA | 

Select Subcommittee:
Author Description Date
Publications  
= = = = = = = = = TCWG General Info = = = = = = = = =
WECC List Phase II Transmission Projects | Sent via email by NTTG. Word doc 256KB. Mar 2, 2008
Boardman Area Map | JPG 433KB Feb 12, 2008
Combined Wind Project Feb 4, 2008 | Sent via email. Excel doc (170KB) Feb 4, 2008
Meeting Slides | PDF 502 KB Jan 24, 2008
= = = = = = = = = = Model Records = = = = = = = = = =
PGE, et al Project Model Records 9-21-09 | 217 KB Excel file (posted Oct 20, 2009). Includes BPA small fixes. Sep 21, 2009
PGE Project Model Records | 189 KB XLS. File includes adjustments to the Southern Crossing Project during the course of PGE Phase 1 studies. Feb 5, 2009
PGE Southern Crossing emf | 58 KB EMF image Jan 26, 2009
Project Model Records | Excel format (189 KB) Includes updated project records for PacifiCorp's Walla walla and PGEs Southern Crossing projects; Northern lights project; and a guide to the different phases of the Northwest - Hemingway, Hemingway - Capt. Jack & Gateway West to which lines should be opened and closed. Aug 6, 2008
NL/TC Northen Lights Contingencies File | 3.2 MB zip file Jul 15, 2008
BPA Resource dispatch - BPA | 119 MB Excel file available from BPA May 14, 2008
PAC PACW Contingencies File | zip file (2 KB) updated May 13 May 2, 2008
PGE PGE Contingency List | File available on request of PGE. Apr 15, 2008
BPA BPA Contingency Files | File available on request from Kyle Kohne, BPA. Apr 14, 2008
PGE Line Records TCWG rev 4-14-08 | Sent via email, Excel file (309 KB) Apr 14, 2008
PG&E PG&E Contingency Files | 36 KB Zip file Apr 4, 2008
PGE Boardman Hub Connection Feb 29, 2008 | Sent via email. Excel file 118KB. Feb 29, 2008
PacifiCorp PacifiCorp Contingency List | Word Doc 47KB Feb 22, 2008
= = = = = = = = = = = = A E S O = = = = = = = = = = = =
AESO AESO Nov 16 Long Term Transmission Stakeholder Presentation | PDF 373KB Feb 12, 2008
= = = = = = = = = = Avista = = = = = = = = = =
Avista Corp. AVA Cover Letter for Devil's Gap Interconnection Report | 279 KB PDF Nov 12, 2008
Avista Corp. AVA Devil's Gap Interconnection Report | 70 KB PDF Nov 12, 2008
Avista Corp. Agenda for Feb 29 Avista meeting Mar 11, 2008
Avista Corp. Avista presentation (WECC process) Mar 11, 2008
Avista Corp. Avista Draft WECC Phase 1 Study Plan | Word Doc (3,074 KB) Feb 12, 2008
= = = = = = = = = = = = B P A = = = = = = = = = = = =
BPA BPA Draft I-5 WECC Phase 1 Rating Study Plan | Word Doc 1,099KB Feb 12, 2008
BPA BPA Draft WOMGIP WECC Phase 1 Rating Study Plan | Word Doc 3,101 KB Feb 12, 2008
= = = = = = = = = = = B C T C = = = = = = = = = = = =
BCTC DRAFT BCTC CNC Study 3000MW Resources Mar 6, 2008 | Excel file sent via email (58KB) Mar 6, 2008
BCTC Draft BCTC Work Plan Mar 6, 2008 | Word doc (63KB) sent via email. Mar 6, 2008
= = = = = = = = = = Idaho Power Co = = = = = = = = =
IPC Idaho Power Co Report Transmittal Letter | 38 KB PDF Nov 26/Dec 3, 2008
IPC Idaho Power Co Boardman-Hemingway Test Phase 1 Report | 4.75 MB PDF Dec 1, 2008
IPC Idaho Power Co Boardman-Hemingway Phase 2 Response Form | 32 KB Word document Dec 3, 2008
Idaho Power Co Contingencies | 78 KB Zip file Mar 24, 2008
Idaho Power Idaho Power Hemingway Study Plan | PowerPoint 125 KB Feb 12, 2008
Idaho Power Idaho Power Gateway West Study Plan | PowerPoint 1,548 KB Feb 12, 2008
= = = = = = = = Northern Lights = = = = = = = =
TransCanada Phase 1 Cover Letter | 47 KB PDF Dec 11, 2008
TransCanada NorthernLights Draft Report | 3 MB PDF Nov 15, 2008
TransCanada PRE Transient Stability Plots | 987 KB PDF Nov 15, 2008
TransCanada N-S Transient Stability Plots | 1.2 MB PDF Nov 15, 2008
TransCanada S-N Transient Stability Plots | 1.5 MB PDF Nov 15, 2008
TransCanada TransCanada 20080212 Path Mtg (pdf) | PDF 193KB Feb 12, 2008
TransCanada TransCanada v2 TC-AB Draft WECC Phase 1 Rating Study Plan | PDF 176KB Feb 12, 2008
= = = = = Pacific Gas & Electric = = = = =
PG&E draft Comprehensive Progress Report for CNC | 2.4 MB Word Doc This Project is being sponsored by Avista, BCTC, PacifiCorp, and PG&E. Dec 12, 2008
PG&E WECC Phase 1 Rating Study Update | 481 KB PowerPoint file. Apr 15, 2008
PG&E PG&E Draft WECC Phase 1 Rating Study Plan | Word Doc 445KB Feb 12, 2008
PG&E PG&E Introduction | PowerPoint 441KB Feb 12, 2008
PG&E PG&E TCWG 2-12-08 | PowerPoint 3,502KB Feb 12, 2008
= = = = = = = = = PacifiCorp = = = = = = = = =
PAC PacifiCorp Meeting Notice - Energy Gateway Phase 1 Study Meeting Dec 11 Nov 14, 2008
Template for TCWG Study Group Plans - Energy Gateway Example | 1.3 MB Word Document Jul 7, 2009
PAC PAC Letter for Walla Walla - McNary | Letter posted Nov 5, 2008. Oct 9, 2008
PAC WECC Regional Planning Review Report for Walla Walla - McNary | Report posted Nov 5, 2008. 895 KB PDF. Oct 1, 2008
PacifiCorp DRAFT Notes Conference Call Mar 5, 2008 | Word doc 40KB Mar 5, 2008
PacifiCorp PacifiCorp 2-12-08 | PowerPoint 1,342KB Feb 12, 2008
PacifiCorp PacifiCorp Hemingway-Capt Jack Study r6 | Word Doc 2,578KB Feb 12, 2008
PacifiCorp PacifiCorp Hub Connection ver2 | Excel 263KB Feb 12, 2008
PacifiCorp PacifiCorp Walla Walla - Wallula - Hub Study | Word Doc 2,741KB Feb 12, 2008
= = = = = Portland General Electric = = = = =
PGE - TCWG Model Records and related Feb 5, 2009
PGE Phase 1 Rating Study Team for Southern Crossing Letter | Sent via email. Adobe Acrobat (9KB). Mar 19, 2008
PGE PGE Copy of Line Records Southern Crossing and BPA-BCNCAL Projects 2-11-08 | Excel 327 KB Feb 12, 2008
PGE PGE Draft WECC Phase 1 Rating Study Plan (Southern Crossing) | Word Doc 147KB Feb 12, 2008
PGE PGE Presentation Study Team 2-12-08 | PowerPoint 244KB Feb 12, 2008
= = = = = Sea Breeze Pacific RTS = = = = =
JdF 1 Project Review Group Report | 1 MB PDF Aug 19, 2009
E John Tompkins, SBP-RTS SBP-RTS JdF Cover Letter | 714 KB PDF Nov 19, 2008
SBP-RTS JdF2 Report | 139 KB PDF Nov 14, 2008