TCWG Publications
| Author | Description | Date |
|---|---|---|
| PUBLICATIONS | ||
| = = = = = = = = = TCWG General Info = = = = = = = = = | ||
| WECC List Phase II Transmission Projects | Sent via email by NTTG. Word doc 256KB. | Mar 2, 2008 | |
| Boardman Area Map | JPG 433KB | Feb 12, 2008 | |
| Combined Wind Project Feb 4, 2008 | Sent via email. Excel doc (170KB) | Feb 4, 2008 | |
| Meeting Slides | PDF 502 KB | Jan 24, 2008 | |
| = = = = = = = = = = Model Records = = = = = = = = = = | ||
| PGE, et al | Project Model Records 9-21-09 | 217 KB Excel file (posted Oct 20, 2009). Includes BPA small fixes. | Sep 21, 2009 |
| PGE | Project Model Records | 189 KB XLS. File includes adjustments to the Southern Crossing Project during the course of PGE Phase 1 studies. | Feb 5, 2009 |
| PGE | Southern Crossing emf | 58 KB EMF image | Jan 26, 2009 |
| Project Model Records | Excel format (189 KB) Includes updated project records for PacifiCorp's Walla walla and PGEs Southern Crossing projects; Northern lights project; and a guide to the different phases of the Northwest - Hemingway, Hemingway - Capt. Jack & Gateway West to which lines should be opened and closed. | Aug 6, 2008 | |
| NL/TC | Northen Lights Contingencies File | 3.2 MB zip file | Jul 15, 2008 |
| BPA | Resource dispatch - BPA | 119 MB Excel file available from BPA | May 14, 2008 |
| PAC | PACW Contingencies File | zip file (2 KB) updated May 13 | May 2, 2008 |
| PGE | PGE Contingency List | File available on request of PGE. | Apr 15, 2008 |
| BPA | BPA Contingency Files | File available on request from Kyle Kohne, BPA. | Apr 14, 2008 |
| PGE | Line Records TCWG rev 4-14-08 | Sent via email, Excel file (309 KB) | Apr 14, 2008 |
| PG&E | PG&E Contingency Files | 36 KB Zip file | Apr 4, 2008 |
| PGE | Boardman Hub Connection Feb 29, 2008 | Sent via email. Excel file 118KB. | Feb 29, 2008 |
| PacifiCorp | PacifiCorp Contingency List | Word Doc 47KB | Feb 22, 2008 |
| = = = = = = = = = = = = A E S O = = = = = = = = = = = = | ||
| AESO | AESO Nov 16 Long Term Transmission Stakeholder Presentation | PDF 373KB | Feb 12, 2008 |
| = = = = = = = = = = Avista = = = = = = = = = = | ||
| Avista Corp. | AVA Cover Letter for Devil's Gap Interconnection Report | 279 KB PDF | Nov 12, 2008 |
| Avista Corp. | AVA Devil's Gap Interconnection Report | 70 KB PDF | Nov 12, 2008 |
| Avista Corp. | Agenda for Feb 29 Avista meeting | Mar 11, 2008 |
| Avista Corp. | Avista presentation (WECC process) | Mar 11, 2008 |
| Avista Corp. | Avista Draft WECC Phase 1 Study Plan | Word Doc (3,074 KB) | Feb 12, 2008 |
| = = = = = = = = = = = = B P A = = = = = = = = = = = = | ||
| BPA | BPA Draft I-5 WECC Phase 1 Rating Study Plan | Word Doc 1,099KB | Feb 12, 2008 |
| BPA | BPA Draft WOMGIP WECC Phase 1 Rating Study Plan | Word Doc 3,101 KB | Feb 12, 2008 |
| = = = = = = = = = = = B C T C = = = = = = = = = = = = | ||
| BCTC | DRAFT BCTC CNC Study 3000MW Resources Mar 6, 2008 | Excel file sent via email (58KB) | Mar 6, 2008 |
| BCTC | Draft BCTC Work Plan Mar 6, 2008 | Word doc (63KB) sent via email. | Mar 6, 2008 |
| = = = = = = = = = = Idaho Power Co = = = = = = = = = | ||
| IPC | Idaho Power Co Report Transmittal Letter | 38 KB PDF | Nov 26/Dec 3, 2008 |
| IPC | Idaho Power Co Boardman-Hemingway Test Phase 1 Report | 4.75 MB PDF | Dec 1, 2008 |
| IPC | Idaho Power Co Boardman-Hemingway Phase 2 Response Form | 32 KB Word document | Dec 3, 2008 |
| Idaho Power Co Contingencies | 78 KB Zip file | Mar 24, 2008 | |
| Idaho Power | Idaho Power Hemingway Study Plan | PowerPoint 125 KB | Feb 12, 2008 |
| Idaho Power | Idaho Power Gateway West Study Plan | PowerPoint 1,548 KB | Feb 12, 2008 |
| = = = = = = = = Northern Lights = = = = = = = = | ||
| TransCanada | Phase 1 Cover Letter | 47 KB PDF | Dec 11, 2008 |
| TransCanada | NorthernLights Draft Report | 3 MB PDF | Nov 15, 2008 |
| TransCanada | PRE Transient Stability Plots | 987 KB PDF | Nov 15, 2008 |
| TransCanada | N-S Transient Stability Plots | 1.2 MB PDF | Nov 15, 2008 |
| TransCanada | S-N Transient Stability Plots | 1.5 MB PDF | Nov 15, 2008 |
| TransCanada | TransCanada 20080212 Path Mtg (pdf) | PDF 193KB | Feb 12, 2008 |
| TransCanada | TransCanada v2 TC-AB Draft WECC Phase 1 Rating Study Plan | PDF 176KB | Feb 12, 2008 |
| = = = = = Pacific Gas & Electric = = = = = | ||
| PG&E | draft Comprehensive Progress Report for CNC | 2.4 MB Word Doc This Project is being sponsored by Avista, BCTC, PacifiCorp, and PG&E. | Dec 12, 2008 |
| PG&E | WECC Phase 1 Rating Study Update | 481 KB PowerPoint file. | Apr 15, 2008 |
| PG&E | PG&E Draft WECC Phase 1 Rating Study Plan | Word Doc 445KB | Feb 12, 2008 |
| PG&E | PG&E Introduction | PowerPoint 441KB | Feb 12, 2008 |
| PG&E | PG&E TCWG 2-12-08 | PowerPoint 3,502KB | Feb 12, 2008 |
| = = = = = = = = = PacifiCorp = = = = = = = = = | ||
| PAC | PacifiCorp Meeting Notice - Energy Gateway Phase 1 Study Meeting Dec 11 | Nov 14, 2008 |
| Template for TCWG Study Group Plans - Energy Gateway Example | 1.3 MB Word Document | Jul 7, 2009 | |
| PAC | PAC Letter for Walla Walla - McNary | Letter posted Nov 5, 2008. | Oct 9, 2008 |
| PAC | WECC Regional Planning Review Report for Walla Walla - McNary | Report posted Nov 5, 2008. 895 KB PDF. | Oct 1, 2008 |
| PacifiCorp | DRAFT Notes Conference Call Mar 5, 2008 | Word doc 40KB | Mar 5, 2008 |
| PacifiCorp | PacifiCorp 2-12-08 | PowerPoint 1,342KB | Feb 12, 2008 |
| PacifiCorp | PacifiCorp Hemingway-Capt Jack Study r6 | Word Doc 2,578KB | Feb 12, 2008 |
| PacifiCorp | PacifiCorp Hub Connection ver2 | Excel 263KB | Feb 12, 2008 |
| PacifiCorp | PacifiCorp Walla Walla - Wallula - Hub Study | Word Doc 2,741KB | Feb 12, 2008 |
| = = = = = Portland General Electric = = = = = | ||
| PGE - TCWG Model Records and related | Feb 5, 2009 | |
| PGE | Phase 1 Rating Study Team for Southern Crossing Letter | Sent via email. Adobe Acrobat (9KB). | Mar 19, 2008 |
| PGE | PGE Copy of Line Records Southern Crossing and BPA-BCNCAL Projects 2-11-08 | Excel 327 KB | Feb 12, 2008 |
| PGE | PGE Draft WECC Phase 1 Rating Study Plan (Southern Crossing) | Word Doc 147KB | Feb 12, 2008 |
| PGE | PGE Presentation Study Team 2-12-08 | PowerPoint 244KB | Feb 12, 2008 |
| = = = = = Sea Breeze Pacific RTS = = = = = | ||
| JdF 1 Project Review Group Report | 1 MB PDF | Aug 19, 2009 | |
| E John Tompkins, SBP-RTS | SBP-RTS JdF Cover Letter | 714 KB PDF | Nov 19, 2008 |
| SBP-RTS | JdF2 Report | 139 KB PDF | Nov 14, 2008 |